Growth Solution

Project Mission

In the heart of Clifton, our mission was to revolutionize Mr. Tahir’s residence with a sustainable energy solution. Fueled by a commitment to environmental responsibility and cost-effective energy, our goal was to install a 6kW hybrid solar panel system, seamlessly integrating clean power generation into Mr. Tahir’s lifestyle.

The Challenge Of Project

Project Information
Clients:
Mr Tahir
System Size:
6kw
System Type:
Hybrid
Location:
Clifton
Unit Production Per Month:
720
Unit Production Per Year:
8,640
Monthly Saving:
39,600
Annual Saving:
475,200
CO2 Reduction Per year
8.208 ton
Project Completion Timeline:
20 days
Category:
Residential