Growth Solution

Project Mission

Our mission was to empower Mr. Jawwad with a sustainable energy solution that not only reduced his electricity bills but also contributed to environmental conservation. By installing a 6 kW on-grid solar panel system in Malir Cantt, we aimed to provide him with reliable energy independence while significantly decreasing his carbon footprint. Our goal was to deliver a cost-effective solution that maximized savings and minimized environmental impact.

 

The Challenge Of Project

Project Information
Clients:
Mr. Jawwad
System Size:
6 kw
System Type:
On-Grid
Location:
Malir Cantt
Unit Production Per Month:
720
Unit Production Per Year:
8,640
Monthly Saving:
39,600
Annual Saving:
475,200
CO2 Reduction Per year
8.208 mt(t)
Project Completion Timeline:
15 days
Category:
Residential