Growth Solution

Project Mission

In an effort to harness sustainable energy and reduce reliance on traditional power sources, Mr. Jawaid Askari embarked on a mission to install a 12 kW solar panel system at his residence in Askari 5. The primary goal was to significantly decrease electricity expenses while contributing to environmental conservation by minimizing carbon emissions. Additionally, the project aimed to serve as a case study to inspire and educate others in the community about the benefits and feasibility of renewable energy solutions.

Throughout the installation process, several challenges were encountered, including securing permits and approvals from local authorities, optimizing the system design to maximize energy production efficiency, and ensuring seamless integration with the existing grid infrastructure. Despite these hurdles, the project team remained committed to delivering a high-quality solution tailored to Mr. Askari’s needs, ultimately achieving success within a tight timeframe of 15 days.

The Challenge Of Project

Project Information
Clients:
Mr. Jawaid Askari
System Size:
12 kw
System Type:
On-Grid
Location:
Askari 5
Unit Production Per Month:
1,440
Unit Production Per Year:
17,280
Monthly Saving:
79,200
Annual Saving:
950,400
CO2 Reduction Per year
16.416 ton
Project Completion Timeline:
15 days
Category:
Residential