Project Mission

In Gulshan-e-Hadeed, our mission was to empower Mr. Fayyaz with a sustainable energy solution that not only reduces his dependency on conventional power sources but also contributes to a greener environment. By installing a 10kW on-grid solar system, our goal was to provide Mr. Fayyaz with reliable energy production, significant cost savings, and a reduced carbon footprint.

We aimed to execute the project seamlessly within a tight timeline of 15 days while ensuring optimal system performance and customer satisfaction. Our commitment was not just to install solar panels but to deliver a comprehensive solution tailored to Mr. Fayyaz’s specific energy needs and location requirements.

 

The Challenge Of Project

Project Information
Clients:
Mr Fayyaz
System Size:
10 kw
System Type:
On-Grid
Location:
Gulshan-e-Hadeed
Unit Production Per Month:
1,200
Unit Production Per Year:
14,400
Monthly Saving:
66,000
Annual Saving:
792,000
CO2 Reduction Per year
13.68 ton
Project Completion Timeline:
15 days