Residential – Zynergy Solutions https://zynergysolutions.com Thu, 12 Sep 2024 12:23:41 +0000 en-US hourly 1 https://wordpress.org/?v=6.7.1 6 KW On-Grid Solar Panel Case Study | Malir Cantt https://zynergysolutions.com/rt-portfolios/6-kw-on-grid-solar-panel-case-study-malir-cantt/ Mon, 18 Mar 2024 10:45:15 +0000 https://zynergysolutions.com/?post_type=rt-portfolios&p=10029
Play Video
Play Video
Growth Solution

Project Mission

Our mission was to empower Mr. Jawwad with a sustainable energy solution that not only reduced his electricity bills but also contributed to environmental conservation. By installing a 6 kW on-grid solar panel system in Malir Cantt, we aimed to provide him with reliable energy independence while significantly decreasing his carbon footprint. Our goal was to deliver a cost-effective solution that maximized savings and minimized environmental impact.

 

The Challenge Of Project

Project Information
Clients:
Mr. Jawwad
System Size:
6 kw
System Type:
On-Grid
Location:
Malir Cantt
Unit Production Per Month:
720
Unit Production Per Year:
8,640
Monthly Saving:
39,600
Annual Saving:
475,200
CO2 Reduction Per year
8.208 mt(t)
Project Completion Timeline:
15 days
Category:
Residential
]]>
10 KW On-Grid Solar Panel Case Study | Juhar https://zynergysolutions.com/rt-portfolios/10-kw-on-grid-solar-panel-case-study-juhar/ Mon, 18 Mar 2024 10:40:39 +0000 https://zynergysolutions.com/?post_type=rt-portfolios&p=10024
Play Video
Play Video
Growth Solution

Project Mission

In the heart of Juhar, our mission was to provide Mr. Sajid with an efficient, sustainable energy solution that not only met his power needs but also contributed to a greener environment. We aimed to demonstrate the tangible benefits of solar energy, showcasing its affordability, reliability, and positive environmental impact.

 

The Challenge Of Project

Project Information
Clients:
Mr. Sajid
System Size:
10 kw
System Type:
On-Grid
Location:
Juhar
Unit Production Per Month:
1,200
Unit Production Per Year:
14,400
Monthly Saving:
66,000
Annual Saving:
792,000
CO2 Reduction Per year
13.68 mt(t)
Project Completion Timeline:
15 days
Category:
Residential
]]>
10 KW On-Grid Solar Panel Case Study | DOHS Malir Cantt https://zynergysolutions.com/rt-portfolios/10-kw-on-grid-solar-panel-case-study-dohs-malir-cantt/ Mon, 18 Mar 2024 10:36:40 +0000 https://zynergysolutions.com/?post_type=rt-portfolios&p=10019
Play Video
Play Video
Growth Solution

Project Mission

Our mission was to provide Mr. Tahir Rana with a sustainable energy solution that would not only reduce his electricity bills but also contribute to environmental preservation. By installing a 10 kW on-grid solar panel system at his residence in DOHS Malir Cantt, we aimed to significantly lower his dependence on the grid, thereby paving the way for long-term savings and a greener lifestyle.

We endeavored to ensure seamless integration of the solar panel system with Mr. Rana’s existing infrastructure while prioritizing efficiency and reliability. Our goal was to demonstrate the viability and benefits of solar energy adoption in residential settings, promoting sustainability and financial independence for our clients.

 

The Challenge Of Project

Project Information
Clients:
Mr. Tahir Rana
System Size:
10 kw
System Type:
On-Grid
Location:
DOHS Malir Cantt
Unit Production Per Month:
1,200
Unit Production Per Year:
14,400
Monthly Saving:
66,000
Annual Saving:
792,000
CO2 Reduction Per year
13.68 mt(t)
Project Completion Timeline:
15 days
Category:
Residential
]]>
10 KW On-Grid Solar Panel Case Study | NHS Karsaz https://zynergysolutions.com/rt-portfolios/10-kw-on-grid-solar-panel-case-study-nhs-karsaz/ Mon, 18 Mar 2024 10:32:36 +0000 https://zynergysolutions.com/?post_type=rt-portfolios&p=10013
Play Video
Play Video
Growth Solution

Project Mission

In the heart of NHS Karsaz, our mission was to implement a sustainable energy solution that not only reduced electricity costs but also contributed to environmental preservation. We aimed to demonstrate the feasibility and efficacy of solar power in residential settings, showcasing its potential to empower communities with renewable energy sources. By deploying a 10 kW on-grid solar system, our objective was to catalyze a shift towards cleaner, more sustainable energy practices, setting a precedent for future initiatives in the region.

 

The Challenge Of Project

Project Information
Clients:
Mr. Arsalan
System Size:
10 kw
System Type:
On-Grid
Location:
NHS Karsaz
Unit Production Per Month:
1,200
Unit Production Per Year:
14,400
Monthly Saving:
66,000
Annual Saving:
792,000
CO2 Reduction Per year
13.68 mt(t)
Project Completion Timeline:
15 days
Category:
Residential
]]>
3 KW Hybrid Solar Panel Case Study | NHS Karsaz https://zynergysolutions.com/rt-portfolios/3-kw-hybrid-solar-panel-case-study-nhs-karsaz/ Mon, 18 Mar 2024 10:28:00 +0000 https://zynergysolutions.com/?post_type=rt-portfolios&p=10008
Play Video
Play Video
Growth Solution

Project Mission

In response to the growing need for sustainable energy solutions, our mission was to implement a reliable and efficient solar panel system at NHS Karsaz. We aimed to provide Mr. Arsalan with a renewable energy source that not only reduces his electricity bills but also contributes to a cleaner environment. By harnessing solar power, our goal was to empower homeowners like Mr. Arsalan to take control of their energy consumption while making a positive impact on their surroundings.

 

The Challenge Of Project

Project Information
Clients:
Mr. Arsalan
System Size:
3 kw
System Type:
Hybrid
Location:
NHS Karsaz
Unit Production Per Month:
360
Unit Production Per Year:
4,320
Monthly Saving:
19,800
Annual Saving:
237,600
CO2 Reduction Per year
4.104 mt(t)
Project Completion Timeline:
10 days
Category:
Residential
]]>
7 KW On-Grid Solar Panel Case Study | Gulshan-e-Iqbal https://zynergysolutions.com/rt-portfolios/7-kw-on-grid-solar-panel-case-study-gulshan-e-iqbal/ Mon, 18 Mar 2024 10:21:56 +0000 https://zynergysolutions.com/?post_type=rt-portfolios&p=10002
Play Video
Play Video
Growth Solution

Project Mission

In the heart of Gulshan-e-Iqbal, our mission was to empower Mr. Raffaq with sustainable energy independence through a bespoke solar solution. We aimed to seamlessly integrate a 7kW on-grid system into his residential property, not only slashing his electricity bills but also reducing his carbon footprint significantly. Our endeavor was to provide him with a reliable, cost-effective renewable energy solution tailored to his needs, ensuring long-term environmental and financial benefits.

Amidst the project, we encountered several challenges typical of urban solar installations. Limited rooftop space, complex grid connections, and adherence to local regulations were primary hurdles. Additionally, optimizing panel placement for maximum efficiency while considering the orientation of his home posed a technical challenge. Balancing aesthetics with functionality was crucial to meet both Mr. Raffaq’s preferences and the project’s performance goals. Despite these challenges, our team’s expertise and dedication ensured the successful implementation of the solar panel system within a tight timeframe of 10 days.

 

The Challenge Of Project

Project Information
Clients:
Mr. Raffaq
System Size:
7 kw
System Type:
On-Grid
Location:
Gulshan-e-Iqbal
Unit Production Per Month:
840
Unit Production Per Year:
10,080
Monthly Saving:
46,200
Annual Saving:
554,400
CO2 Reduction Per year
9.576 mt(t)
Project Completion Timeline:
10 days
Category:
Residential
]]>
12 KW On-Grid Solar Panel Case Study | Gulshan-e-Jamal https://zynergysolutions.com/rt-portfolios/12-kw-on-grid-solar-panel-case-study-gulshan-e-jamal/ Mon, 18 Mar 2024 10:15:48 +0000 https://zynergysolutions.com/?post_type=rt-portfolios&p=9996
Play Video
Play Video
Growth Solution

Project Mission

In our mission to promote sustainable energy solutions, we undertook the project to install solar panels for Mr. Afzal in Gulshan-e-Jamal. The primary goal was to provide him with a reliable, renewable energy source that would significantly reduce his electricity bills while minimizing his carbon footprint. By harnessing solar power, we aimed to contribute to a cleaner environment and empower residential users like Mr. Afzal to take control of their energy consumption.

The Challenge Of Project

Project Information
Clients:
Mr. Afzal
System Size:
12 kw
System Type:
On-Grid
Location:
Gulshan-e-Jamal
Unit Production Per Month:
1,440
Unit Production Per Year:
17,280
Monthly Saving:
79,200
Annual Saving:
950,400
CO2 Reduction Per year
16.416 mt(t)
Project Completion Timeline:
10 days
Category:
Residential
]]>
10 KW On-Grid Solar Panel Case Study | Askari 5 https://zynergysolutions.com/rt-portfolios/10-kw-on-grid-solar-panel-case-study-askari-5/ Mon, 18 Mar 2024 09:30:59 +0000 https://zynergysolutions.com/?post_type=rt-portfolios&p=9990
Play Video
Play Video
Growth Solution

Project Mission

In Askari 5, our mission was to empower Mr. Akhter with sustainable energy solutions that not only reduced his carbon footprint but also provided significant long-term savings. By installing a 10 kW on-grid solar panel system, our aim was to seamlessly integrate renewable energy into his residential property, ensuring reliable power supply while contributing to a greener environment.

With a commitment to sustainability and cost-effectiveness, we embarked on a journey to transform Mr. Akhter’s energy consumption habits. Our goal was to demonstrate the feasibility and benefits of solar energy in a residential setting, emphasizing its role in mitigating climate change and fostering energy independence.

 

The Challenge Of Project

Project Information
Clients:
Mr. Akhter
System Size:
10 kw
System Type:
On-Grid
Location:
Askari 5
Unit Production Per Month:
1,200
Unit Production Per Year:
14,400
Monthly Saving:
66,000
Annual Saving:
792,000
CO2 Reduction Per year
13.68 mt(t)
Project Completion Timeline:
15 days
Category:
Residential
]]>
30 KW Hybrid Solar Panel Case Study | Juhar https://zynergysolutions.com/rt-portfolios/30-kw-hybrid-solar-panel-case-study-juhar/ Mon, 18 Mar 2024 09:25:10 +0000 https://zynergysolutions.com/?post_type=rt-portfolios&p=9985
Play Video
Play Video
Growth Solution

Project Mission

Our mission was to empower Mr. Moazzam with sustainable energy solutions by installing a 30 kW solar panel system in Juhar. By harnessing solar power, our aim was to significantly reduce his electricity costs while also contributing to the reduction of carbon emissions in the region. This endeavor aligned with our commitment to promoting renewable energy adoption and fostering environmental sustainability within the community.

 

The Challenge Of Project

Project Information
Clients:
Mr. Moazzam
System Size:
30 kw
System Type:
Hybrid
Location:
Juhar
Unit Production Per Month:
3,600
Unit Production Per Year:
43,200
Monthly Saving:
198,000
Annual Saving:
2,376,000
CO2 Reduction Per year
41.04 mt(t)
Project Completion Timeline:
20 days
Category:
Residential
]]>
5 KW On-Grid Solar Panel Case Study | Drigh Road https://zynergysolutions.com/rt-portfolios/5-kw-on-grid-solar-panel-case-study-drigh-road/ Mon, 18 Mar 2024 09:17:30 +0000 https://zynergysolutions.com/?post_type=rt-portfolios&p=9980
Play Video
Play Video
Growth Solution

Project Mission

At Zynergy Solution, our mission was to empower Mr. Umar with sustainable energy solutions tailored to his residential needs. We aimed to install a reliable and efficient solar panel system at his Drigh Road residence, enabling him to significantly reduce his carbon footprint while enjoying long-term cost savings.

Through meticulous planning and personalized consultations, we strived to make the transition to solar energy seamless for Mr. Umar. Our goal was not only to meet his energy requirements but also to exceed his expectations by delivering a solution that enhances his lifestyle and contributes to a cleaner, greener environment.

The Challenge Of Project

Project Information
Clients:
Mr. Umar
System Size:
5 kw
System Type:
On-Grid
Location:
Drigh Road
Unit Production Per Month:
600
Unit Production Per Year:
7200
Monthly Saving:
33,000
Annual Saving:
396,000
CO2 Reduction Per year
6.84 mt(t)
Project Completion Timeline:
10 days
Category:
Residential
]]>