Commercial – Zynergy Solutions https://zynergysolutions.com Tue, 19 Mar 2024 15:09:55 +0000 en-US hourly 1 https://wordpress.org/?v=6.7.1 15 KW On-Grid Solar Panel Case Study | korangi https://zynergysolutions.com/rt-portfolios/15-kw-on-grid-solar-panel-case-study-korangi/ Mon, 19 Feb 2024 15:05:23 +0000 https://zynergysolutions.com/?post_type=rt-portfolios&p=10707
Play Video
Play Video
Growth Solution

Project Mission

In an era where sustainability is paramount, our mission with the Korangi Mosque Solar project was twofold. Firstly, we aimed to provide Masjid Abbas with a reliable, renewable energy solution to significantly reduce their carbon footprint. Secondly, we strived to demonstrate the practicality and benefits of solar energy adoption in commercial settings, particularly in densely populated urban areas like Korangi.

 

The Challenge Of Project

Project Information
Clients:
Masjid Abbas
System Size:
15 kw
System Type:
On-Grid
Location:
korangi
Unit Production Per Month:
1,800
Unit Production Per Year:
21,600
Monthly Saving:
99,000
Annual Saving:
1,188,000
CO2 Reduction Per year
20.52 ton
Project Completion Timeline:
20 days
Category:
Commercial
]]>
25 KW On-Grid Solar Panel Case Study | Gulshan Jamal https://zynergysolutions.com/rt-portfolios/25-kw-on-grid-solar-panel-case-study-gulshan-jamal/ Mon, 19 Feb 2024 15:00:37 +0000 https://zynergysolutions.com/?post_type=rt-portfolios&p=10702
Play Video
Play Video
Growth Solution

Project Mission

Masjid Hilal aimed to embrace sustainable energy solutions by implementing a 25kw solar panel system. Our mission was to empower the mosque with clean energy, reducing its carbon footprint while setting an example for the community. We strived to optimize energy efficiency and cost-effectiveness, ensuring long-term environmental and financial benefits for Masjid Hilal.

 

The Challenge Of Project

Project Information
Clients:
Masjid Hilal
System Size:
25 kw
System Type:
On-Grid
Location:
Gulshan jamal
Unit Production Per Month:
3,000
Unit Production Per Year:
36,000
Monthly Saving:
165,000
Annual Saving:
1,980,000
CO2 Reduction Per year
34.2 ton
Project Completion Timeline:
15 days
Category:
Commercial
]]>
25 KW Hybrid Solar Panel Case Study | Arifwala https://zynergysolutions.com/rt-portfolios/25-kw-hybrid-solar-panel-case-study-arifwala/ Sun, 18 Feb 2024 11:28:07 +0000 https://zynergysolutions.com/?post_type=rt-portfolios&p=10047
Play Video
Play Video
Growth Solution

Project Mission

Our mission with the 25kW on-grid solar panel installation in Arifwala was twofold. Firstly, we aimed to provide Mr. Kashif with a sustainable energy solution that not only reduces his electricity bills but also minimizes his environmental footprint. Secondly, we aimed to showcase the viability and benefits of solar energy in commercial settings, encouraging more businesses in the region to adopt renewable energy solutions.

 

The Challenge Of Project

Project Information
Clients:
Mr Kashif
System Size:
25 kw
System Type:
On-Grid
Location:
Arifwala
Unit Production Per Month:
3000
Unit Production Per Year:
36,000
Monthly Saving:
165,000
Annual Saving:
1,980,000
CO2 Reduction Per year
34.2 ton
Project Completion Timeline:
30 days
Category:
commercial
]]>
6KW On-Grid Solar Panel Case Study | Gulshan-e-Iqbal https://zynergysolutions.com/rt-portfolios/6kw-on-grid-solar-panel-case-study-gulshan-e-iqbal/ Mon, 05 Feb 2024 14:52:37 +0000 https://zynergysolutions.com/?post_type=rt-portfolios&p=9628
Play Video
Play Video
Growth Solution

Project Mission

Rashid Ashraf is embarking on a transformative journey towards a sustainable and eco-friendly lifestyle by spearheading the installation of a 6kW On-Grid Solar Panel System at his residence nestled in the vibrant locale of Gulshan-e-Iqbal. With a vision firmly rooted in environmental stewardship, Rashid aims to significantly reduce his carbon footprint and contribute to the global push for clean energy adoption. This project seeks to showcase the feasibility and benefits of renewable energy, inspiring others in the community to embrace solar power solutions for a greener and more sustainable future.

The Challenge Of Project

Project Information
Clients:
Rashid Ashraf
System Size:
6kw
System Type:
On-Grid
Location:
Gulshan-e-Iqbal
Unit Production Per Month:
720
Unit Production Per Year:
8,640
Monthly Saving:
39,600
Annual Saving:
475,200
CO2 Reduction Per year
8.208 ton
Project Completion Timeline:
20 days
Category:
Residential
]]>