Project Mission

In the heart of Gulshan-e-Hadeed, our mission was to empower Mr. Shezad with a sustainable and cost-effective energy solution. We aimed to seamlessly integrate a 10kW on-grid solar system into his residence, ensuring maximum energy production and substantial long-term savings. By executing this project flawlessly, our broader goal was to contribute to a greener and more environmentally conscious future for Gulshan-e-Hadeed.

The Challenge Of Project

Project Information
Clients:
Mr Shezad
System Size:
10kw
System Type:
On-Grid
Location:
Gulshan-e-Hadeed
Unit Production Per Month:
1,200
Unit Production Per Year:
14,400
Monthly Saving:
66,000
Annual Saving:
792,000
CO2 Reduction Per year
13.68 ton
Project Completion Timeline:
25 days