Cart Total Items (0)

Cart

Play Video
Play Video
Growth Solution

Project Mission

Madarsa Al Sulah’s mission was to implement a sustainable energy solution that aligns with their commitment to environmental responsibility and cost-efficiency. By installing a 7kw hybrid solar panel system in Shersha, they aimed to significantly reduce their carbon footprint while also realizing substantial savings on their energy bills.

The project sought to demonstrate the viability and effectiveness of renewable energy solutions for residential settings, empowering homeowners in Shersha and beyond to embrace eco-friendly alternatives and contribute to a greener, more sustainable future.

 

The Challenge Of Project

Project Information
Clients:
Madarsa Al Sulah
System Size:
7 kw
System Type:
Hybrid
Location:
Shersha
Unit Production Per Month:
840
Unit Production Per Year:
10,080
Monthly Saving:
46,200
Annual Saving:
554,400
CO2 Reduction Per year
9.576 ton
Project Completion Timeline:
15 days
Category:
Residential