Cart Total Items (0)

Cart

Play Video
Play Video
Growth Solution

Project Mission

In the heart of Juhar, our mission was clear: empower Mr. Furrukh with sustainable energy solutions through the installation of a 5kW hybrid solar panel system. Our goal was not only to reduce his carbon footprint but also to provide substantial monthly savings while ensuring minimal impact on his daily life. By leveraging cutting-edge technology and meticulous planning, we aimed to demonstrate the feasibility and benefits of renewable energy adoption in residential settings.

 

The Challenge Of Project

Project Information
Clients:
Mr Furrukh
System Size:
5 kw
System Type:
Hybrid
Location:
Juhar
Unit Production Per Month:
600
Unit Production Per Year:
7,200
Monthly Saving:
33,000
Annual Saving:
396,000
CO2 Reduction Per year
6.84 ton
Project Completion Timeline:
15 days
Category:
Residential